
Renewable energy


Project development · Offshore wind
SWER develops renewable energy projects, with a specific focus on offshore wind energy along the Portuguese coast.
Illustrative image. It does not depict a SWER project.
01 / About us
South Western Europe Renewables (SWER) is part of HexaWatt Group. It focuses on developing renewable energy projects, with a specific direction towards offshore wind and projects currently in development along the Portuguese coast.

Renewable energy
Engineering, energy and infrastructure

Healthcare engineering
02 / Projects
Intelligent layout optimisation
Leixões on the horizon. 1 GW turning wind into energy.
The objective is to develop a 1 GW offshore wind farm off the coast of Leixões.
Select the area and let the algorithm do the work. We maximise energy production and minimise installation costs in a single click.
The optimisation solution is in development. This describes the project goal and is not an operational tool currently available.
1 GW
This video demonstrates our initial offshore layout optimisation prototype.
01 /
Manual offshore turbine planning is complex and time-consuming. Miscalculating the wake effect between turbines and inefficient submarine cable routing can lead to significant financial losses and unnecessary CAPEX costs.
02 /
Develop a tool that mathematically finds the most suitable layout within a selected geographic area. The focus is reducing LCOE (Levelized Cost of Energy) by positioning turbines to capture as much wind as possible with the least infrastructure.
03 /
Accelerate the global energy transition by providing engineers and investors with advanced technology. We aim to make offshore wind projects more profitable, predictable, and faster to implement.
A map-based interface where drawing the concession area polygon is all it takes to start a project.
In developmentThe software calculates thousands of iterations to find the positioning that generates the greatest financial return.
In developmentAutomatic routing of the shortest, most efficient cable paths to connect turbines to the substation.
In developmentGet precise data on estimated production and installation costs in minutes.
In developmentTell us how we can help. Our team will get back to you.